Wednesday, May 25, 2011

Pre Loading Steel Pipe on vessel MV. ROYAL PRIME

Setelah beberapa lama tidak ada pekerjaan preloading survey steel pipe, baru-baru ini kembali saya mengerjakan pekerjaan survey pre-loading steel pipe dikapal MV. ROYAL PRIME.

Kapal MV. ROYAL PRIME berbendera Vietnam ini sandar di pelabuhan Batu Ampar, Batam, sedangkan kargo yg dimuat di stack open yard milik PT. TPCO Pan Asia di Kabil dan PT. SMB Indusri di Telaga Punggur.

Kargo yg dimuat tidak banyak karena kapal ini berukuran kecil saja, dengan LOA hanya 73.94 M saja, owner kapal ini adalah perusahaan Vietnam yaitu Royal Shipping & Trading Co., Ltd, untuk keagenan di Batam dihandle oleh PT. Haluan Segara Lines.

Pipa-pipa ini adalah milik Chevron Thailand Exploration and Production Ltd, pelabuhan bongkarnya di Songkhla, Thailand, Pipa-pipa yg diangkut berukuran 7" dan tubing pipe 2-7/8" semua dalam keadaan baik.

Kehadiran kami dikapal tersebut, atas pemintaan PT. Sealink Marine Services, Jakrta acting on behalf P and I Services West of England, Hongkong, shipper kargo ini adalah PT. Maransi Prima International.

Perjalanan kapal dari Batam ke Songkhla, Thailand akan ditempuh dalam masa 2 hari dan 12 jam.

Thursday, May 19, 2011

Draft Survey Software Free Download

Draft Survey Software Free Download

Link Free Download for Draft Survey Software
Download here

Variable Condition Steel Pipe on Pre Loading Survey

During pre loading survey steel pipe, the surveyor must be attending at open yard area to monitor the cargo loading one by one to minimize the damaged of cargo during loading and the pointing the cargo damage was found before loading operation was commencement.

record of condition the steel pipe during loading like below inspection;

§ The cargo was stowed on open yard at the shipper premises and not properly covered by a plastic sheet for protection and exposed to weather and dust.

§ The cargoes were losses packed, coated and provided with cover protector at both and side of pipes. Prior to loading some cargoes were found dust stained, spot rusted and slightly scratched at several places on externally surface.

§ The cargo was stowed on cargo hold’s deck space in lengthwise position.

§ No Cargo damaged during loading operation.

§ No shorted/over landed cargo.

Pre Loading Steel Pipe

We have inquire to survey on board MT. Royal Prime, this survey for P and I protection, the survey call as Pre Loading Survey Steel Pipe.

The survey must be reported condition of cargo at open yard of the shipper before loading operation was commencement, like this report;

Before Loading, the cargo was stacked at open yard of PT. Citra Tubindo Tbk premises was stowed on open yard and not properly covered with plastic sheet for protection and exposed to weather and dust. The cargoes were losses packed, coated and provided with cover protector at both and side of pipes. Prior to loading some cargoes were found dust stained, spot rusted and slightly scratched at several places on externally surface.

The survey also mentioned what appliance was using for the cargo were loaded on to the cargo holds from the truck trailers by using 1 (one) unit shore crane of 100 tons SWL or the other appliance was playable .

Gas Free Survey

Gas free survey on board MT. Sulawesi Palm at Tanjung Uncang area , Batam with detail ship particulars of vessel below;

Name of Vessel : MT. SULAWESI PALM

Port of Registry : Jakarta

Flag : Indonesia

Gross Tonnage : 11,248

Net Tonnage : 5,040

Dimensions : 144.00 M (L.O.A)

: 23.00 M (Breadth)

: 12.5 M (Depth)

Owner : PT. New Ship Nusa Bersama

Date of Survey : May 18, 2011

Place of Inspection : Tanjung Uncang Anchorage area, Batam

Time of Inspection : 16.00 hrs up to 18.00 hours local time.

Ship’s tank No. :

· Port : 1, 2, 3, 4, 5, 6 and Slop

· Starboard : 1, 2, 3, 4, 5, 6 and Slop

· Multi Gas Detector : Gas Alert MAX XT Model XT-XWHM-Y-OR Serial No.

110-005299 from Manufacturer BW Technologies.


Based on our inspection, we are of the opinion that the ship’s tank were found free gas condition and that hot works are safe to be carried out.

Download Translator Software For Seafarers


is an easy-to-use translation tool for your daily multilingual needs.
This application uses the power of Internet machine language translation engines, and helps you to easily
translate Web contents, letters, chat, and emails.
employs the state-of-the-art machine language translation power of Internet translation engines,
and enables you to easily translate Web contents, letters, chat, and emails.
Currently, Ace Translator supports translations between following languages:
· English
· French
· German
· Italian
· Dutch
· Portuguese
· Spanish
· Catalan
· Greek
· Russian
· Chinese (Simplified)
· Chinese (Traditional)
· Japanese
· Korean
· Finnish
· Czech
· Danish
· Romanian
· Bulgarian
· Croatian
· Filipino
· Hindi
· Indonesian
· Latvian
· Lithuanian
· Norwegian
· Serbian
· Ukrainian
· Slovak
· Slovenian
· Swedish
· Polish
· Vietnamese
· Arabic
· Hebrew

download di

http://pelaut.biz/index.php/topic,9.0.html

jika anda butuh software untuk perhitungan draft survey kapal silahkan kunjungi langsung website ini http://draftsurveysoftware.com

Download Gratis P2TL 1972 Versi Bahasa Indonesia

Apa kata orang tentang P2TL ada yang menyebut
PIMTL – Peraturan Internasional Mencegah Tubrukan di Laut

ColReg – Collision Regulation

Peraturan Laut

Aturan Di Laut

Aturan Berlayar

Aturan Navigasi Di Laut

:) ada yang bilang di keyword Track saya : Peraturan Pelayaran
Ebook pertama saya yang menggunakan single .exe Kenapa saya menggunakan .exe dan bukanya .Pdf? karena : No Need Installation No Need More Resource No Need Big memory No need Big hardDisc No Change Registry setting No Need Adobe Reader Faster Than .Pdf Better Than .doc ( Microsoft Word )
Versi ini adalah V 0.2 FoC = Free Of Charge!! – Gratis
Cara pemakaian eBook : Download, kemudian double klik, pakai.
Change Log : V. 0.2 ” removed Password
Requirement : – Ie 6 atau yang lebih baru atau – FireFox atau – Opera atau browser lainnya
DOwnload Link : Klik Here (maaf saat ini lagi tidak berfungsi)

Sumber : blog.pelaut

download converter Pro

File lama, dibongkar lagi.. Convert everything, sangat dibutuhkan untuk pelaut. Gunakan waktu kepepet, kalau tidak kepepet, pakai manual

Karena manual akan mengasah otak anda.

File tersebut single .exe. Tidak butuh instalasi, tidak merubah registry system windows anda, tidak ada virus, malware, adware maupun spyware. Sudah dicoba scan memakai AVAST PRO, AVG dan AVIRA AntiVir..

Resul : No Virus

Dalam format lain (bentuk excel file) akan saya upload secepatnya ( buat dulu )

Download disini

jika anda butuh software untuk perhitungan draft survey kapal silahkan kunjungi langsung website ini http://draftsurveysoftware.com


Load Star Software

Loading Software

Loading Software

Load Star Software..

Tak sengaja nemu software ini.. Software milik MAERSK TAIKUNG

Silahkan di sedot ( Education Purpose Only )

http://www.4shared.com/file/91729076/542d8d4a/LOADSTAR.html

jika anda butuh software untuk perhitungan draft survey kapal silahkan kunjungi langsung website ini http://draftsurveysoftware.com

ASTROMAP

Pernah melihat Bintang di langit kan? Di dunia pelayaran bintang sangat berarti sekali. Karena itu adalah penunjuk arah alam yang paling awal muncul di dunia.

Ilmu untuk mempelajarinya di sebut Astronomi . Buat Mahasiswa ilmu pelayaran Tiap jam mata kuliah ini selalu datang, dan kampus pun penuh. Biarpun, terus terang ini pelajaran yang susah.

Untuk itu, anda bisa mempalajari software ini. Software lama, tapi masih relevant untuk education. Tidak berhubungan dengan kuliah Astronomi.

Software ini akan menunjukan anda posisi bintang pada saat :
1. jam tertentu di lokasi anda. Silahkan set waktunya, karena semua kota sudah terindeks..
2. menunjukan kondisi pada 4 tempat berbeda, langit utara, selatan, timur dan barat..

Untuk education purpose, silahkan di download di sini :

[hidepost]http://www.4shared.com/file/100374739/2ff67058/ASTROMAP.html[/hidepost]

jika anda butuh software untuk perhitungan draft survey kapal silahkan kunjungi langsung website ini http://draftsurveysoftware.com

Indonesia Crude Production Declining

Once an oil exporter, Indonesia this year is expected to import about 500,000 barrels of crude per day as its production continues to decline below the target as set in the 2011 state budget at 970,000 barrel per day (bpd).

"We predict that our oil and condensate production would only reach about 950,000 bpd up to the end of the year. After all, at present the average oil production level is only about 910,000 bpd," Head of the Upstream Oil and Gas Regulating Agency (BP Migas) R Priyono said.

BP Migas, he said, would face difficulty to achieve the production target of 970,000 barrels per day (bpd). According to the BP Migas chief, unplanned shutdowns of oil fields have been among the causes of the declining in the country’s crude production.

The government is actually targeting a crude production of 1.2 million bpd, a figure which is still below the domestic need of about 1.4 million bpd. This would force the government to import crude at the amount of over 500,000 bpd.

Increase in production is much expected from oil contractors. However most of them have not yet fulfilled their commitment.

The BP Migas said 77 or 72 percent of 107 oil and gas blocks signing contracts between 2002 and 2008 have yet to fulfill exact commitment to conduct explorations. Only 30 or 28 percent of them have met the commitment, according to BP Migas data made available on Monday.

Earlier at a meeting with Energy and Mineral Resources Minister Darwin Saleh, BP Migas Chief R Priyono said 23 or 24 percent of the 77 blocks failed to meet the commitment because of contractors’ internal problems.

The internal problems concerned among others operators’ rights, finance, and holding companies’ priorities, the data show. Meanwhile, 15 or 16 percent of the 77 blocks failed to meet the commitment because of overlapping claims to land, 14 or 15 percent because of geological and geophysical factors, and 12 or 13 percent because of compensation problems.

The data show 10 or 11 percent failed to meet the commitment due to the absence of supporting equipment and services, 9 percent due to operational problems, 8 or 9 percent due to the absence of data and 2 percent due to special conditions such as those in Aceh and border areas.

In an effort to raise production, BP Migas will discuss it with the government. "Thus, to achieve the 950,000 bpd this month, the remaining production must be set at an average of 970,000 bpd," he said.

He said that efforts carried out so far to increase production were among others preventing the unplanned shutdowns particularly in the work areas of ConocoPhillips and PT chevron Pacific Indonesia. BP Migas will also do its best to reduce the declining production rate which at present is about two percent to below one percent, or at least similar to the achievement made in 2010.

Production in 2010 was set at 965,000 bpd but the realization was only 956,000 bpd. The declining in the country’s oil production caused Vice President Boediono to express concern on Wednesday that the oil sector had not yet shown good performance.

"There is a sector I am not happy about namely our oil sector which is not performing well. Oil production has dropped," he said in his address at the opening of the 35th Indonesia Petroleum Association (IPA) Convention and Exhibition.

The rate of oil explorations is still far before the need to increase production to achieve the production target of 1.2 million barrels a day. Therefore, the government is serious to cooperate with oil investors and industrialists to settle problems.

To overcome the situation, the vice president said, it needs cooperation to find the right and sustainable model and real improvement in its implementation. "We also need to work hard to find a way to get quicker gains," he said.

Among the ways are, he said, increasing efforts to exploit the potentials of oil production hike and eliminate unexpected production stoppages that would affect oil production.

"I will ask BP Migas and the ministry of energy and mineral resources to pay a serious attention to the issue," he said.

In the meantime, Energy and Mineral Resources Minister Darwin Saleh has promised to increase the country’s crude oil production as requested by Vice President Boediono.

"The request of the vice president is a challenge," the minister said here on Wednesday. His ministry and the BP Migas would cooperate closely to raise national oil production.

According to the minister, the recent decline in oil production has been caused more by unplanned shutdowns. "We will ask contractors to reduce the number of shutdowns," he said.

The long-term challenge was how to speed up the production increase through enhanced oil recovery (EOR) efforts such as the use of surfactant in the field of PT Chevron Pacific Indonesia (CPI).

"We have applied the EOR system but we still need time to carry it out perfectly. If that already happens oil production will peak in the 2025-2030 period," he said.

Indonesian Patrol Catches Six Viatnamese Fishing Boats

The patrol boat Hiu 010 of the Marine Affairs and Fisheries Ministry had been reported to catch six Vietnamese fishing boats when illegally fishing in the South China Sea on Wednesday.

Head of the Belawan Marine Resources and Fishery Control Station Mukhtar said here Wednesday that the six illegal Vietnamese fishing boats had been intercepted and caught for failure in showing their fishing permits from the Marine Affairs and Fisheries Ministry. The six trawlers had been arrested in the South China Sea at coordinates 05’55"00 N - 108’03’00 E.

"Captain of HIU 010 Marthin reported to us that the six Vietnamese fishing boats are now being held at the Tarempa pier in Anambas regency, Riau Islands province, for further investigation," he said. The Vietnamese boats are KM. KG1396, KM. KG 1594, KM. KG 1196, KM. KG 91991, KM. BV 5482 dan KM. BV 5487 with a total of 60 crew members.

Wednesday, May 11, 2011

Indonesia's CPO Output Expected to Reach 40 Mln Tons



AFP Workers sort out oil palm bunches before processing them at a factory in Dengkil, on the outskirts of Kuala Lumpur on November 4, 2009. Malaysia is the worlds second-largest exporter of palm oil after Indonesia, and the industry is the countrys third largest export earner, raking in 65.2 billion ringgit (19 billion USD) in 2008.

JAKARTA, KOMPAS.com - Indonesia’s crude palm oil (CPO) output is projected to reach 40 million tons in the next 10 years, former agriculture minister Bungaran Saragih said.

The target could be achieved if the government focused on increasing the productivity of oil palm plantations, he said at an international conference & exhibition on palm oil (ICE-PO) at the Jakarta Convention Center on Wednesday.

"Today the area of land is limited so it is impossible to expand oil palm plantations. What we can do to raise production is increasing the productivity of oil palm plantations," he said.

The productivity of oil palm plantation currently reached 3 tons per hectare and the national CPO output stood at 22-23 million tons per year. To reach CPO production of 40 million tons a year, the productivity of oil palm plantation must be raised to 6 tons from 3 tons per hectare, he said.

He put the blame on poor cultivation for the low productivity of the country’s oil palm plantations. Meanwhile, Chief of the Indonesian Plantation Businessmen Association (GPPI) Soedjai Kartasasmita predicted that the palm oil industry would have bright prospects in the future.

In the next five years the global population would increase, leading to a rise in food demand particularly vegetable oil, he said. "The increase in the use of bio-fuels will increase CPO demand."